Yucca Mt Warning Project
Title: Poppin' Fresh
Lenny Bruce Lee, author
"It's
a mighty world we live in
but,
the truth is
we're
only passin' through."
- J. Cash/R. Scruggs
REQUIREMENTS & FUNCTIONAL SPECIFICATIONS
This (Draft) Document is being produced to provide information on the proposed Universal Warning Sign:Yucca Mountain: Poppin' Fresh. It is to act as a guideline in defining and developing proposed system requirements, analysis, design, and deliverables.
Document organization:
The document is organized in the following manner:
Webpages consisting of an animated simulation of the Poppin' Fresh Yucca Mountain Project (YMP) warning signal/safe entry system with content consisting of the simulation and digital representations of various design documents including scaled drawings, material lists, etc. (The Yellow Path).
Webpages designed to allow users/visitors access to information pertaining to Yucca Mountain activities (The Red Path).
Webpages designed to allow users/visitors access to information detailing what can be done to reduce the production of high-level nuclear wastes.
"Golden" CD - A CD containing an ISO9660 level 2 CD-ROM file format image of the complete code and images for the first version. This should be done each time a new version of the site is released.
The background of the project is described
in the Call
for Submissions to the Universal Warning Sign: Yucca Mountain.
System Charter:
The Poppin' Fresh system shall:
Expected operational environment (hardware, peripherals, etc.):
This system shall involve:
Functional, operational (interface, resource, performance, etc.), and data requirements.
This section requires further analysis work particularly in identifying the Key Functions of the System. The system is still in many ways at the initial stages of analysis. At this point, we have these Subsystems identified. Now as analysis progresses we should begin to create and use case scenarios to allow a better definition of the system's functions.
Top Level Subsystems comprising Poppin' Fresh system:
I. Poppin' Fresh Yellow Path Subsystem:
1. HTML Description of "Poppin' Fresh Universal Warning Sign/Safe Exploration Event Signaler"
2. HTML Drawings of metrics and materials for Popup
3.
HTML Animation/SlideShow of 10k years prior to insertion of Warning System
through 10k years after insertion.
II. Intentional Intrusion Red Path Subsystem:
1. Dynamically produced Webpages of topical sites and events information regarding Yucca Mountain
III. Green Path Subsystem:
1. Dynamically produced Webpages of sites and information for alternatives and options regarding nuclear materials production and disposal.
IV. Dynamic Text Markup Language (DTML) page production subsytem:
1. PHP calls and functions
2. mySQL database with necessary information to create DTML pages (data structures to be determined)
V. Comment/Request email Subsystem:
1. subscribe/unsubscribe features for email notification of site changes
2. PHP script to parse and handle responds to user requests for notification
VI. Help and Frequently Asked Questions (FAQ) Subsystem:
1. In this version, only a short users guide will
be available from a hypertext link.
Given the short amount of time in planning this document, it was impossible
to carefully consider timelines and milestones. A preliminary consideration
has produced this notion, the project including building the yellow, red
and green paths can be accomplished with approximately 100 additional manhours.
A date of 15 January 2002 is assumed to be an easily reachable milestone
in which the system can be designed, coded, tested and handed-off for a
production implementation of Poppin' Fresh v.1.